Advertisement · 728 × 90

Posts by Aaron Stoll

rebranding transmission service to transmission-as-a-service (TaaS)

10 months ago 1 0 0 0

Ok but obviously Cajun music is more interesting and important

11 months ago 2 1 0 0

And even if it’s defined as an N-2 rather than N-1, could always just adjust the planning manual to require mitigations for P7 cont if they don’t already (i.e., rather than change cont definitions, change which cont require mitigations)

11 months ago 3 0 1 0

I will say, I’ve seen several ISOs and utilities situationally define the loss of a double circuit line as an N-1 cont (common tower) in planning studies (though not in ops) even though technically a common structure is a P7 so I think this is somewhat dependent on region/engineering judgement

11 months ago 3 0 1 0
Post image

chatgpt has some comments on electricity market design👀

11 months ago 0 0 0 0

easily the worst 😂

11 months ago 1 0 1 0

Fwiw energy twitter also does not have the juice anymore. It’s so low signal it’s hard to justify even engaging anymore

11 months ago 6 0 1 0
Advertisement

someone needs to build an AI agent that’s sole purpose is to “retire” misaligned/nefarious AI agents and call it blade runner

1 year ago 1 0 0 0

Yep. And to be fair, I think some of their comments make good points. But also think that some of them miss the mark and would like to see some sort of analysis that explains their position

1 year ago 2 0 0 0

Maybe they should share that “analysis” then? Have heard them bring up the issue in several meeting and have read their comments but haven’t seen it backed up by much in-depth analysis

1 year ago 3 0 1 0

In 1927 PSEG, PEC, and PPL interconnected their systems to pool power. This effectively was “interregional” transmission at the time.

The same people fighting transmission today benefit massively from the interconnected system pioneered in the past that is what we know as “the grid” today.

1 year ago 1 0 1 0

Which again is different than what you said lol

1 year ago 0 0 0 0

Eh, no not really.

And the real point that you’re making here (or should be) is that capacity markets as currently constructed are nonsensical and certainly will need to be reformed

1 year ago 1 0 1 0

That doesn’t equate to your meme.

And thermal resources are not 100% reliable, which is why you see that dynamic (obviously)

1 year ago 1 0 1 0

None of NERC’s modeling shows that renewables need 100% backup. Neither does MISO’s RIIA which you do frequently love to site.

1 year ago 1 0 1 0

Come for the elite climate and energy reporting, stay for dope music

1 year ago 3 0 1 0
Post image

Hard to speak in hypotheticals but doubt you’d need the same amount of duplicative cap. After all, this problem is the exact reason the grid was built in the first place. Did you happen to see my tweet ;)

1 year ago 1 0 1 0
Advertisement

That point was purely to point out that additional transmission capacity actually helps bring new gen online and has compounding effects

1 year ago 0 0 1 0

The last sentence there misses the mark for me, new Tx has the compounding effect of enabling additional generation. Even firm gen can’t get through an IX queue rn

1 year ago 0 0 1 0

The BA does not have control over the procurement of gas unless it is a utility that owns their own generation (so not applicable in the RTO regions for sure)

1 year ago 1 0 1 0

No one here is saying transmission will perform at 100% of nameplate all the time - just like generation doesn’t. But that is diff than saying it has zero reliability value. I suppose along this same vein you think nat gas has zero reliability value without firm gas contracts right?

1 year ago 1 0 1 0

I didn’t respond to that because that’s not a good indication that interregional lines have ~zero~ reliability value. It’s just an example of a case where they aren’t given winter accreditation (which may even be the right choice in that case, it’s very situational)

1 year ago 2 0 1 0

Yeah those points are obviously distinct. But I was responding to your assertion that cat is someone who knows what they’re talking about, which I don’t agree with (or maybe they’re are an industry participant and are just bad at it lol)

1 year ago 1 0 1 0

Electric cat didn’t even know there was a difference between MISO’s current LRTP projects and the prior MVP projects so yeah I’d take their opinion with a grain of salt

1 year ago 2 0 1 0

If the anti-RTO crowd is actually concerned with consumer protection, it’d be nice to see them advocate for minimum transparency requirements. The amount of data (both planning and operations) readily available in RTO regions versus traditional regions is stark

1 year ago 5 0 0 0

Agreed, I think part of the worry too is centered around the optics and risks of pushing this too much and it not materializing

1 year ago 3 0 0 0
Post image

Risks…?

The issue is, the even though the data center load growth forecasts can be duplicative, the power industry’s pace of change will still be the limiting factor to new development

www.utilitydive.com/news/load-fo...

1 year ago 5 0 1 0
Advertisement

Thanks!

1 year ago 1 0 0 0

right away*

1 year ago 1 0 0 0

Thank you!

1 year ago 0 0 0 0