The new Serverroom for the #SCC #HPC at the @unisalzburg.bsky.social is almost complete. Just a few more weeks and the servers can be installed!

1 year ago 3 1 0 0
Post image Post image Post image Post image

The NAWI @unisalzburg.bsky.social is getting ready for all the extra heat of the #SCC #HPC.

1 year ago 5 2 0 0

Thanks a lot!

1 year ago 1 0 0 0
Huge power cables coming out of a rack.

Huge power cables coming out of a rack.

In a few minutes, the lights at the NAWI of the @unisalzburg.bsky.social are going to go out to modernize the power system in preparation for the #SCC!
#HPC

1 year ago 5 1 1 0
Server Racks with the newly installed door.

Server Racks with the newly installed door.

Tanks for the cooling water.

Tanks for the cooling water.

Lot's of pipes for the cooling water.

Lot's of pipes for the cooling water.

You already know that cooling is essential for the #SCC #HPC @unisalzburg.bsky.social! The freshly installed doors that seal the server aisles are just as essential as the tanks for the cooling water and the pipes.

All to keep the #SCC chill!

1 year ago 4 1 1 0
Pipes for the cooling system mounted to the ceiling. They are not yet connected to the InRows.

Pipes for the cooling system mounted to the ceiling. They are not yet connected to the InRows.

Back view of an InRow Cooler with 8 big fans.

Back view of an InRow Cooler with 8 big fans.

The #SCC @unisalzburg.bsky.social is going to produce lots of heat. State of the art InRow cooling systems are already installed to get it out if the server room. Pipes for the cooling water are also almost ready.

#HPC #Salzburg #PLUS

1 year ago 4 2 0 0
The server room for the SCC under construction. Wires and pipes are already installed but not connected. Server racks can be seen in the room. They are wrapped in plastic film to protect them from the dust.

The server room for the SCC under construction. Wires and pipes are already installed but not connected. Server racks can be seen in the room. They are wrapped in plastic film to protect them from the dust.

The server room for the SCC under construction. Wires and pipes are already installed but not connected. Server racks can be seen in the room. They are wrapped in plastic film to protect them from the dust.

The server room for the SCC under construction. Wires and pipes are already installed but not connected. Server racks can be seen in the room. They are wrapped in plastic film to protect them from the dust.

Construction of the new server room is coming along. Power lines, tubes for cooling water and fire prevention systems are installed.

#HPC #Salzburg #PLUS