Advertisement · 728 × 90

Posts by DLP Works

Post image Post image Post image Post image

➡️ The southernmost section of the pathway is nearing completion, with the new surface now installed.
➖ Only minor landscaping remains before this section can reopen in #DisneylandParis.

3 hours ago 4 0 0 0

[Live] 🚧⚠️ Update on the floor refurbishment at Disney Hotel Cheyenne!

➡️ Works on the paths along ‘Rio Grande’ continue and are approaching the western edge of the hotel.
➖ The area between the bridges connecting the hotel with Disney Hotel Santa Fe is now also under refurbishment.

3 hours ago 4 0 1 0
Post image Post image Post image Post image

➡️ Walls have been moved nearby, to Coffee House and General Store, which are undergoing the same type of refurbishment in #DisneylandParis!

3 hours ago 4 0 0 0

[Live] 🚧🤠Woodwork renovation continues at Disney Hotel Cheyenne!

➡️ The Chuck Wagon Café canopy renovation is complete!
➖ The wooden railings have been entirely replaced & look brand new!

3 hours ago 4 0 1 0
Post image Post image Post image Post image

➡️ More red brick theming have been placed on the wall close to the Gaumont cinema in #DisneylandParis

3 hours ago 5 0 0 0

ive] 🚧🧱Casa Giulia continues to receive its theming!

➡️ The Italian restaurant is now fully sealed, with all windows installed, ensuring the structure is watertight and airtight.
➖ Electrical & ventilation systems are being installed inside.

3 hours ago 5 0 1 0
Post image Post image Post image Post image

➡️ Disney Wonders, the new retail location, is scheduled to open in summer 2026, as announced by #DisneylandParis (this timeline appears to be uncertain).

3 hours ago 3 0 0 0

➡️ Inside the building, groundwork and logistics are ongoing; partitions are not yet installed. The entrance has been temporarily widened to allow vehicles access.

3 hours ago 3 0 1 0
Advertisement

[Live] 🏗️🛍️ Update on the #DisneyVillage transformation!

➡️ Outside, the roof is being covered with a support structure to allow the installation of insulation & later the external metal cladding. The facades remain unchanged for now.

3 hours ago 3 0 1 0
Post image Post image Post image Post image

➡️ Some walls have been installed next to the pool (which remains open for now) to allow workers to store equipment as close as possible to the lodges.
➖ Trees around have been protected against construction works.

1 day ago 3 0 0 0

[Live] 🚧🐿️ Latest update on the The Sequoia Lodge refurbishment!!

➡️ As announced by #DisneylandParis on April 12, the hotel's five lodges are undergoing renovations until the first quarter of 2027.

1 day ago 3 0 1 0
Post image Post image Post image Post image

➖🌳Trees are expected to be planted in its place while awaiting future projects. #DisneylandParis.

1 day ago 5 0 0 0

➡️ Several iconic elements have already been removed, such as the yellow arches, the red terrace, or even the Metal roof supports!
➡️ Works are set to continue over the next few months, with the main structure due to be demolished soon:

1 day ago 3 0 1 0

[Live] 🚧🏗️🍔 McDonald's demolition underway!

➡️ Following a demolition permit & the opening of the new restaurant nearby, the old McDonald's in #DisneyVillage has been quietly undergoing demolition, just behind large tarps!

1 day ago 4 0 1 0
Post image Post image Post image Post image

3️⃣ On the right side of the construction site more large load-bearing pillars have been erected!!⚠️

➡️ You can check out our latest aerial views for another perspective (dated April 10th).

1 day ago 5 0 1 0

2️⃣ Geomembranes, mobile concrete batching plants, utility shafts or formwork panels, are stored at the rear of the site. The three cranes are working hard, attesting the ongoing activity in #DisneylandParis!

1 day ago 2 0 1 0

[Analysis] 🚧🦁 Vertical Construction continues on the future World of Lion King!

1️⃣ From the ground, the walls of the Lion King attraction's water reservoir are now also visible!

1 day ago 4 0 1 0
Post image Post image Post image Post image

➡️ As a reminder, the flat ride will be named “Wilderness Explorers Sky Wings” (WESS) & is set to open in 2027:
➖ We’ve shared exclusive details in a dedicated post on April 5 🔍

1 day ago 3 0 0 0
Advertisement

[Live] 🚧🎈 More updates on the future swing ride coming to #DisneylandParis!

➡️ From this perspective taken from Adventure Way, the impressive scale of the building surrounding the attraction gets real:
➖ Construction is progressing at a good rythm now!

1 day ago 2 0 1 0
Post image Post image Post image Post image

4️⃣ Behind the attraction, the main structural works for the technical building have been completed.

1 day ago 5 0 0 0

2️⃣ Electrical & network conduits are protruding from the poured concrete slab inside the future #DisneylandParis attraction’s queue.
3️⃣ Raw materials (plaster, etc.) and construction equipments are stored on-site.

1 day ago 2 0 1 0

[Analysis] 🚧🎈 Latest update on The Wilderness Explorers Sky Swings (Up-themed attraction)!

1️⃣ Since our latest report, the remaining queue metal poles and beams have been installed, now connecting both sides.

1 day ago 6 0 1 0

➡️ This permit marks another milestone in the large-scale transformation currently underway accross the #DisneylandParis resort!😍

1 month ago 2 0 0 0

➖An increase in total floor area
➖Removal of the double-skin structure currently installed in front of the glass façade of the lobby.

➡️All these developments point to a major construction project on the horizon, involving a complete exterior overhaul along with a deep modernization of the interior!

1 month ago 2 0 1 0

➡️ According to the permit description, the works will include:
➖ Modifications of the main entrance façade,
➖ Demolition of 2 existing entrance canopies (located in front of the main entrance),
➖ Complete interior refurbishment of all common areas,
➖ Renovation of the exteriors,

1 month ago 1 0 1 0
Post image

[News] ⚠️🚨 Permit filed for the transformation of the Gaumont cinema into Pathé!!

➡️ A new building permit was filed on Feb20 to transform the last remaining Gaumont cinema in 🇫🇷 into a Pathé, featuring significant architectural upgrades designed to align with the ongoing redesign of #DisneyVillage.

1 month ago 8 0 1 1
Post image Post image Post image Post image

[Analysis] 🚧🛎️ Covered queue project at The Hollywood Tower Hotel nearly complete!!

➡️ All roof tiles have now been installed. They closely match the Tower’s existing roofs, though they appear less weathered.🙄
➡️ Some interior work within the queue area may still be pending! #DisneylandParis

1 month ago 8 0 0 0
Post image Post image Post image Post image

3️⃣ On the first floor, the ventilation ducts are being stored awaiting their upcoming installation. #DisneylandParis

1 month ago 4 0 0 0
Advertisement

[Analysis] 🚧🍕Air conditioning installation at Casa Giulia!

1️⃣ Window installation continues on the first floor of the building.
2️⃣ Although the restaurant is not yet weatherproof, the air conditioning and fiberglass insulation are being installed.

1 month ago 2 0 1 0
Post image Post image Post image Post image

[Analysis] 🚧 Update at Chuck Wagon Café refurbishment!

➡️ The building’s wooden canopy is now covered with scaffolding and a protective tarp.
➡️ Vertical supports are holding up the canopy during the renovations. #DisneylandParis

1 month ago 5 0 0 0