Advertisement ยท 728 ร— 90

Posts by Hotel 7 // Lavender

Video

Signal F609 pinging between proceed and stop in front of trains tonight

3 months ago 9 2 1 0

good stuff right there

6 months ago 1 0 0 0
Post image Post image Post image Post image

Signals & passive crossings near Long Island Junction

7 months ago 4 0 0 0
Post image Post image Post image

Recent platform 1 extension at Moorabbin. For XT2 I imagine. New signal post and heads for MRN712, a fixed red signal.

7 months ago 3 0 0 0
Post image Post image Post image

The traffic lights at Clarinda Rd and Old Dandenong road are looking quite unnecessary now, with the SRL closure of a chunk of Old Dandy to the south the only through route here is a loop back in to Clarinda

7 months ago 1 0 0 0

There will be a reduced frequency on this bit of the line during peak times, with more trains terminating and originating at Cheltenham and Moorabbin. No reduction to the ten minute frequency enjoyed through most other hours.

7 months ago 1 0 0 0
Post image Post image Post image

The westbound lane boom barrier on McDonald St has been swapped with a split one, to fit under the future viaduct. Original crossovers remain on the up end. There's a rail in the middle of the single track, which seems to have been taken from one of the recently removed tracks as it is quite shiny.

7 months ago 4 0 1 0
Post image Post image Post image Post image

Two tracks have been removed through Mordialloc, with only the platform one track remaining.

7 months ago 12 2 2 0
Advertisement
Post image

The train in platform 2 (left) is departing in about 13 minutes for East Pakenham. The train in the turnback siding (middle) is forming that Cranbourne in 6 minutes. The train approaching platform 1 (right) is running an East Pakenham service right now

8 months ago 4 0 0 0
Post image

They've had to dig out a chunk of the road and install these copper wires to keep the track circuit continuity

8 months ago 6 0 1 0
Post image Post image Post image Post image

Broken rail inside the Millers St level crossing near Seaholme station. 40km/h speed restriction over the broken rail. This is the second broken rail in a level crossing on the Altona Loop in a month.

8 months ago 7 0 3 0
Post image Post image

oh and hidden under the "No trains operating" banner we see that the services say they end at Bonbeach! So does the PTV app!

9 months ago 3 0 0 0
Post image Post image Post image

Also, here are the medium speed aspects of BON782 over the 65km/h crossover.

9 months ago 2 0 1 0
Video

Interestingly, after trains have turned back they say they are a "Frankston via City Loop" service

9 months ago 1 0 1 0
Post image Post image Post image Post image

Anyway, enjoy some shots of empty trains between Carrum and Bonbeach

9 months ago 3 0 1 0

I can't think of another instance where this has happened, a train running empty to a regular yet artificially inaccessible platform just to turn back. Bonbeach is the least used station on the line, and I know Carrum is a better place for buses, but why not just let people on ๐Ÿคทโ€โ™€๏ธ

9 months ago 4 0 1 0
Advertisement
Post image Post image Post image Post image

However, passengers are not allowed on the trains to or from Bonbeach, so every train runs empty to and from. Barriers at Bonbeach block you from entering the platform that the train sits at.

9 months ago 4 0 1 0
Post image Post image

Strange operation on the Frankston line this weekend. Buses replace trains between Cheltenham and Carrum due to works at Mordialloc, but due to the location of the crossover near Carrum trains need to go ahead to Bonbeach before returning over the crossover back to Carrum ๐Ÿงต

9 months ago 5 1 1 0
Post image

The lesser known punch out between Melbourne Central and State Library stations for passengers going between the lifts

9 months ago 5 0 1 0
Post image Post image Post image Post image

Taking a diverted 86 over the Miller St hump

9 months ago 6 0 0 0
Post image Post image Post image Post image
9 months ago 9 2 1 0
Post image Post image Post image Post image

Boronia

9 months ago 5 0 0 0
Post image Post image Post image Post image
9 months ago 9 0 1 0
Video

Shepparton train wrong lining back to Craigieburn after the train in front of us failed at Donnybrook from a few days ago

9 months ago 4 0 1 0
Post image Post image

I believe I was the only passenger on the 14:45 Marshall to Southern Cross service today, until we got to South Geelong. The points from Marshall platform 1 up to the main line are 80km/h.

9 months ago 5 0 0 0
Post image

It was a McKenzie & Holland No.6 Pattern frame, and is now in the hands of the Daylesford Railway

9 months ago 0 0 0 0
Advertisement
Post image Post image Post image Post image

In the new South Geelong station waiting room and office they have many reminders of the old lever frame, including the final configuration pull chart hanging up

9 months ago 8 0 2 0
Post image Post image

New Sunshine superhub related maps released showing the project area and the rough locations of the Sunbury line and Bendigo line flyovers among other works bigbuild.vic.gov.au/news/melbour...

9 months ago 6 0 0 0

third ever*

10 months ago 3 0 0 0
Post image Post image Post image

All seven carriages to myself. At WeFo the train went out of service, but the PIDs showed direct to Watergardens (indicating an empty move to Watergardens or Calder Park sidings)

10 months ago 3 0 1 0