@churchoftrees.bsky.social lands on Osgoode's #NoGoCoffeeCo THIS FRIDAY | 7PM
JOIN US for a night of
sizzling synthpop / synthrock
#OSGOODE #KARS #NORTHGOWER, #MANOTICK, #KEMPTVILLE
Osgoode Link Pathway, facing south
The #Osgoode Link Pathway in #Ottawa, just south of Hunt Club Road today. Looks okay for fat tire #biking with 4 cm of new #snow!
#winter #weather #meteorology
This may be of interest to @richardkbethell.bsky.social & #ottbike
5/6 The surprise ward Keep an eye on #Osgoode ward in 2026 #ottawa election. With #Tewin, a ring road, a landfill fight and old rivals circling, itβs one of the few wards where incumbency may finally meet its match.
@jleiper.bsky.social @neilsara.bsky.social
2/5 Some insiders now see #Ottawa 2026 election as done-deal with most incumbents re-elected.
But maybe not in #Osgoode ward. It could turn into real contest.
@jleiper.bsky.social @lainejohnson.bsky.social @clarkekelly.bsky.social @mayormarksutcliffe.bsky.social
#ottpoli
1/5
There may be real contest in #Osgoode ward in 2026 election if there are 3 main contenders: Colette Lacroix-Velthuis, Doug Thompson, Isabelle Skalski. See my political profile of the ward.
@seandevine9.bsky.social @shawnmenard.bsky.social
cityofottawapolitics.substack.com/p/an-uncerta...
lmao remembering the old days when #scms did like a room raffle to get upgraded to a suite and @melisser3.bsky.social had a suite party but then security showed up (we too noisy) and we had to all go to the ballroom downstairs (???). #osgoode
The Osgoode Link Pathway Observation Deck, now closed off, hopefully to be rebuilt in 2026. I did check with 311 on its status and they submitted a ticket on it.
The Osgoode Link Pathway at Flag Station Road.
Me and Kathryn, dressed for cold and wind.
Me. There was a windchill!
Some scenes from a hike today on The #Osgoode Link Pathway. Temperature was -3Β°C and wind gusting to 50 km/h, so a bit cool and breezy.
We found the city's observation deck has really fallen into disrepair and has now be taped with caution tape. Hopefully it will be rebuilt in 2026.
1/2
Osgoode Link Pathway today, very soft surface.
#Ottawa #Osgoode Link Pathway news: we were biking on the pathway today and it was surprisingly wet and soft, considering not much precipitation in recent days. Very hard going, pretty much unusable for #biking like this.
This may be of interest to @richardkbethell.bsky.social & #ottbike
The Osgoode Link Pathway, with now snow on it.
#Ottawa #Osgoode Link Pathway news: At least for the portion just south of Hunt Club today the pathway was clear of ice and snow.
This may be of interest to @richardkbethell.bsky.social & #ottbike
The Osgoode Link Pathway just south of the Hunt Club Bridge, showing it has been plowed, but the surface is still intact. The blade was lifted and did not plow down to the stonedust surface.
#Ottawa #Osgoode Link Pathway news: after our first #snowfall the pathway was quickly plowed, but, good news, this time they did not destroy the stonedust surface unlike last winter. We'll see how the next plow operator does.
This may be of interest to @richardkbethell.bsky.social & #ottbike
#Conefest
I β€οΈ #conefest!!
The #Ottawa Traffic Cone Festival today on the #Osgoode Link Pathway.
Remember the #conefest motto: "traffic cones for no reason at all!!"
This may be of interest to @pylonograph.bsky.social and @joolzmadcat.bsky.social
Osgoode Pathway at Earl Armstrong Road.
#Ottawa #Osgoode Link Pathway news: the final crossing at Earl Armstrong Road now has its lights fully operational. So all three road crossings now have their lights working.
This may be of interest to @richardkbethell.bsky.social & #ottbike
Crossing Leitrim Road on the Osgoode Link Pathway southbound. The lights are all uncovered and working!
#Ottawa #Osgoode Link Pathway news: the pathway crossing at Leitrim Road is fully operational, including all lights! We tested it this evening. This is the most critical road crossing on the path, because of the high traffic volume.
This may be of interest to @richardkbethell.bsky.social & #ottbike
#Ottawa #Osgoode Link Pathway news: this is a follow-up to my post yesterday that the pathway is now open full length. This video shows the new section. The councillor's office says the traffic lights should be working soon too.
This may be of interest to @richardkbethell.bsky.social & #ottbike
Barriers open at Lester Road looking southbound.
The newly constructed pathway segment past the water plant
Barriers open, pathway in use, looking northbound.
Here is some good news about the #Ottawa #Osgoode Link Pathway: the full pathway is now open, including the newly-built section between Lester and Leitrim Roads, bypassing the water plant road!
This may be of interest to @richardkbethell.bsky.social & #ottbike
Adam
Kathryn
Osgoode Link Pathway road crossing
Osgoode Link Pathway
Some photos from a 40 km #bike trip to #Osgoode and back today with @kathrynbarr.bsky.social.
#biking #bicycle #cycling #cycle #Ottawa
The Osgoode Link Pathway looking north from Leitrim Road: still closed.
The Osgoode Link Pathway looking south from Lester Road: still closed.
#Ottawa #Osgoode Link Pathway news: even though the city councillor for ward 10 was hoping the pathway would be open between Lester and Leitrim Roads for #biking by the end of August, it is still closed. Detour is via Albion Rd.
This may be of interest to @richardkbethell.bsky.social & #ottbike
After: all cleared!
Before photo: a tree blocking the pathway
Many thanks to @en.ottawa.ca for cleaning up a #tree I reported down on the #Osgoode Link Pathway in #Ottawa! Great job!
#ottcity
Me
The Osgoode Link Pathway
The Osgoode Link Pathway
My bike on Tthe Osgoode Link Pathway
Some shots from a little #bike ride I did on the #Osgoode Link Pathway in #Ottawa today.
#biking #bicycle #cycling #cycle
Pathway news
#Ottawa #Osgoode Link Pathway news from Ward 10 city councillor Jessica Bradley.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
Wild flowers
Osgoode Link Pathway
Osgoode Link Pathway
Kathryn on the Osgoode Link Pathway
Some photos from a 36 km #bike ride today with @kathrynbarr.bsky.social on the #Osgoode Link Pathway in #Ottawa.
#biking #bicycle #cycling #cycle
The Osgoode Link Pathway closed south of Lester Road.
#Ottawa #Osgoode Link Pathway news: the pathway remains "sorta" closed from Lester to Leitrim. I say "sorta" because it looks like bikes have been by-passing the fence.
This may be of interest to @richardkbethell.bsky.social #ottbike
The Osgoode Link Pathway closed south of Lester Road
#Ottawa #Osgoode Link Pathway news: it is closed again from Lester to Leitrim, this time due to work on a water processing building 200 m off the pathway. No idea for how long this time.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
4/6 #Westboro progressivism alone wonβt cut it. #Barrhaven potholes, #Osgoode ward snowy backroads, #Kanata gridlockβLeiper must tailor 24 visions, not one-size-fits-all. As Isabel Skalski showed in byelection, local issues matter.
#ottawa
@tkavanaghbayward.bsky.social @riverwardriley.bsky.social
The Osgoode Link Pathway, now repaired. At least all the washboard is gone!
#Ottawa #Osgoode Link Pathway news: the surface repair work to fix last winter's snowplow damage has been completed. The only remaining work is getting the three road crossing traffic lights operational.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
A stone dust crew working on the pathway south of Lester. The stone dust arrives by dump truck, is deposited into an asphalter to be spread and then is rolled, which produces a nice hard and smooth surface for biking on, unless you run a snow plow over it again this coming winter...
The Osgoode Link Pathway south of Lester, all repaired.
The Osgoode Link Pathway between Hunt Club and Lester, repaired and ready for use.
#Ottawa #Osgoode Link Pathway news: the repair work from the winter snowplow damage continues south of Lester and should be done soon. Lester to Hunt Club is completed and servicable!
More in alt text!
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
A new, repaired surface on the Osgoode Link Pathway. As of this morning the work was not completed, but crews were on site working to finish the surface repairs and it should be done later on today.
This was a calibrated survey plinth before someone hit it wit some heavy equipment and smashed it.
#Ottawa #Osgoode Link Pathway news: the damage to the pathway done by snowplowing last winter is finally being repaired with a new 5 cm layer of stone dust. Bad news: they broke a survey plinth.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
the Osgoode Link Pathway.
The flavour was orange pineapple!
Fat Les's in Osgoode
Adam & Kathryn
@kathrynbarr.bsky.social and I did a 50 km #bike round trip to #Osgoode today on the Osgoode Link Pathway. Lunch was sandwiches from Bakker's General Store in Manotick Station and then ice cream at Fat Les's in Osgoode.
#biking #bicycle #cycling #cycle #Ottawa
Soil spreading.
#Ottawa #Osgoode Link Pathway news: It seems that a crew was spreading topsoil along the western side of the pathway between Hunt Club and Lester today. No idea why, the grass had to be cut to make room.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike
New traffic cam at Leitrim Road and the Osgoode Link Pathway
New traffic cam at Leitrim Road and the Osgoode Link Pathway, mounted on the far (southern) lamp stand.
#Ottawa #Osgoode Link Pathway news: the crossing lights at Leitrim Road are still not yet operational yet, but a city traffic cam has been installed. These keep an eye on traffic volumes and accidents.
This may be of interest to @davebikeski.bsky.social @richardkbethell.bsky.social & #ottbike