Map of the tram routes in Kralingen during the construction works. A temporary line 18 is added to the network.
On Friday 17 April, RET is starting track works on metro line ABC until 4 May. For this reason, a temporary line 18 will be introduced. This tram is using the tracks on the Boezemweg between Oostplein and Goudse Rijweg that don’t have a regular service so that […]
[Original post on zug.network]