Advertisement · 728 × 90
#
Hashtag

#CC2DCA

Advertisement · 728 × 90
Preview
CC2DCA Public Hearing Feedback Form Take this survey powered by surveymonkey.com. Create your own surveys for free.

👟🚲✈️Walk Bike Fly?
🚦🧳🧭Ready Set Go!
Log on and weigh in on plans for the multimodal #CC2DCA connector bridge between @CrystalCity + @Reagan_Airport!
Share your thoughts now through SUN, FEB 16: ow.ly/ZUua50UZNo5
For more info: ow.ly/QEI950UZNo6
@arlingtonva.bsky.social @bikearlington.bsky.social

0 1 0 1
Post image Post image

👟🚲✈️Walk Bike Fly?
🚦🧳🧭Ready Set Go!
Log on and weigh in on plans for the multimodal #CC2DCA connector bridge between @CrystalCity + @Reagan_Airport!
Share your thoughts now through SUN, FEB 16: ow.ly/ZUua50UZNo5
For more info: ow.ly/QEI950UZNo6
@arlingtonva.bsky.social @walkarlington.bsky.social

1 0 0 0

Don’t forget to comment on the plans for the new pedestrian and bike bridge between Crystal City and #DCA! The deadline was extended to Feb. 16.

#CC2DCA #bikedc

2 0 0 0
Preview
Crystal City to Reagan National Airport Multimodal Connection (CC2DCA) This project will provide a multimodal connection between Crystal City and Ronald Reagan Washington National Airport (DCA) for use by people walking, biking, and using micromobility devices, with a co...

If you want to provide feedback to Arlington on the #CC2DCA bridge, here’s a link: www.arlingtonva.us/Government/P...

@bikearlington.bsky.social #bikedc

1 0 1 0
Post image

Arlington today seems input from potential users on what they want on the #CC2DCA bridge — the stuff on its 20ft width.

From that, Arlington will create a potential design, refine with its stakeholders, and unveil to the public in fall.

“Project Delivery” here is final design, not construction.

1 0 1 0
Post image

What’s new today is the bridge alignment at the airport, land controlled by MWAA.

The bridge will cross the planned new roadway, pass north of the existing Terminal 2 garage, and connect to terminal across from the NW corner of the existing northern WMATA station entrance. #CC2DCA #DCA

2 1 1 0
Post image Post image

The the #CC2DCA bridge open house in Arlington this afternoon.

The county has a final alignment for the bridge that will connect Crystal City to #DCA: 960ft long, 20ft wide, with a max grade of 3.57% (it’s uphill from the airport to Crystal City).

9 0 2 2