Advertisement · 728 × 90
#
Hashtag
#BARCOM2025
Advertisement · 728 × 90
Murray River, Gonn Crossing. This is where the rafts are built and launched for Expedition 1 (X1)

Murray River, Gonn Crossing. This is where the rafts are built and launched for Expedition 1 (X1)

A mix of steel and plastic drums, ready for the rafts

A mix of steel and plastic drums, ready for the rafts

Raft frame timbers ready for the raft construction weekend

Raft frame timbers ready for the raft construction weekend

WARNING
NAVIGATIONAL HAZARDS
IN THESE WATERS
LOW OVERHEAD CABLES
SHALLOW WATERS
SULMERGED TREES
SUBMERGED FENCING

WARNING NAVIGATIONAL HAZARDS IN THESE WATERS LOW OVERHEAD CABLES SHALLOW WATERS SULMERGED TREES SUBMERGED FENCING

Transport weekend successfully completed; expedition hardware is onsite ready for the Venturers to arrive for next weekend’s build. #BARCOM2025 #Venturers #OutsideIn25

1 0 0 0