1/2 India’s renewable story is no longer constrained by technology or capital—it is being held back by contracts. With 45–55 GW of awarded capacity stuck without signed PPAs, the bottleneck is institutional, not infrastructural.
#PolicyReform #CrisisEconomics #StructuralShift #Governance
0
0
1
0