Advertisement · 728 × 90
#
Hashtag
#SoftEngineering
Advertisement · 728 × 90
River Flood Management GCSE case study: Low Crosby, Cumbria | The Flood Hub

💧Following the #storm, an alleviation scheme was developed. Using #SoftEngineering, embankments were lowered to reconnect the #RiverEden with its floodplain.

✏️We worked with @geographysw.bsky.social & @envagency.bsky.social to produce a #GCSE-level case study about flood management in Low Crosby.

0 0 1 0