BORON SHIPMENTS MOVING STRONG ON THE DANUBE π’
Our regular boron product shipments from Constanta to Krems are continuing, with 4,700 tons being transferred from the ship to barges.
π Water levels are favorable, and transit times will be shortened.
#BoronLogistics #DanubeShipping #Elifmar βπ¦
π¦ Both sling bags and jumbo bags were loaded onto the same vessel, and our shipments will continue as scheduled.
#CementLogistics #DanubeShipping #Elifmar βπ¦π
π’ We have transshipped Colemanite / Bor productions from Mv Kerem Karabekir directly to river barges at Constanta.
π Next stop: Krems (Austria) β the convoy is on the way!
#Colemanite #BorProducts #ConstantaPort #KremsAustria #DanubeLogistics #Transshipment #RiverBarges #HeavyCargo #Elifmar βπ¦π³οΈ
π’ We have loaded 5,500 tons of perlite ore, both in bulk and bagged, to Germany (Schalding).
π The convoy is on the way!
#PerliteOre #BulkCargo #BaggedCargo #Schalding #GermanyLogistics #DanubeTransport #BreakBulk #HeavyCargo #RiverShipping #Elifmar βπ¦π³οΈ
π’ We have loaded 5,400 tons of cement in bags via Constanta to Serbia (Belgrade).
π The convoy is now on its way!
#CementTransport #ConstantaPort #Belgrade #DanubeRiver #BreakBulk #HeavyCargo #SerbiaLogistics #RiverShipping #Elifmar βπ¦π³οΈ
π’ We transport steel profiles of 12 m length to Serbia β Pancevo!
π© Strong logistics for heavy industry needs.
#SteelProfiles #BreakBulk #DanubeLogistics #Pancevo #SerbiaTransport #HeavyCargo #ConstantaPort #ShipToBarge #Elifmar βπ³οΈπ¦
π’ We are handing heavy steel coils at Constanta Romania from ship to river barges using floating crane between ship and barge!!
πDestination: bound for SerbiaβSmederovo (Semendirek) Port. Each coil weighs 27 tons β hot rolled.
#ConstantaPort #SteelCoils #FloatingCrane #ShipToBarge #Elifmar βπ³οΈπ¦π
π’ We have loaded parts of the new Belgrade bridge from ship to barges at Constanta!
π οΈ A key step in connecting the future β now on the Danube River!
πDestination: Belgrade
#BelgradeBridge #ConstantaPort #ShipToBarge #ProjectCargo #DanubeTransport #BridgeParts #BreakBulk #Elifmar #RiverLogistics βππ³οΈ
π’ We are handling heavy coils and cement in bags in Constanta from ship to barges by direct, at that moment!
πDestination Serbia, π low water on Danube River but we have done all adjustments to proceed!
#ConstantaPort #DanubeRiver #BreakBulk #HeavyCoils #CementInBags #ShipToBarge #Elifmar βπ¦π³οΈπ§
π’ We are handling heavy coils and cement in bags in Constanta from ship to barges by direct, at that moment!
πDestination Serbia, π low water on Danube River but we have done all adjustments to proceed!
#ConstantaPort #DanubeRiver #SerbiaLogistics #RiverTransport #LowWaterOperations #Elifmar βπ¦π³οΈπ§
πfrom Constanta to Passau, Krems, Gonyu, all Danube and tail ports,!!!
π§ info@elifmar.com
#DanubeRiver #BreakBulk #ProjectCargo #SteelTransport #CementLogistics #Elifmar #ConstantaToEurope #RiverShipping #LogisticsPartner βπ
πfrom Constanta to Passau, Krems, Gonyu, all Danube and tail ports,!!!
π§ info@elifmar.com
#DanubeRiver #BreakBulk #ProjectCargo #SteelTransport #CementLogistics #Elifmar #ConstantaToEurope #RiverShipping #LogisticsPartner βπ